Installation:

1.
Installation is done on full wooden decking only (thickness >24 mm).
For pitches < 35% is recommended to install a previous protection layer.
Prepare base course cutting lengthways tile tabs. The eaves course is then bonded to the adhesive tabs of the base course.

 

2.
Use five 20 mm large headed 3 galvanised nails per shingle. Nail through strip centre band and into the top edge of the lower course.

 

 

 

3.
If needed shorten the first left (or right) strip by half a tab. On completion check the tile bonding, use adhesive to reinforce laps as required.

4a.


 

4b.